5 – Fireplace dust containment & demo
7 – Fireplace demo / Chimney debris back-fill
8 – Fireplace demo / Chimney debris back-fill
9 – Chimney debris back-fill
10 – Chimney debris back-fill
11 – Chimney debris back-fill
12 – Chimney – Center-fireplace debris-back-fill
13 – Side fireplaces flues – debris back-fill
14 – Side fireplaces flues – debris back-fill
15 – Demo beehive height demo / pour cement footing
16 – Floor lay out debris removal
17 – Woodbox floor set – Masonry – Load brick/scaffold/prep chimney
19 – Wood box completed, slab support, Masonry
20 – Beehive slab poured, roof top flashing, chimney rebuild, Masonry
21 – Chimney rebuild, Masonry
22 – Chimney rebuild, Masonry
23 – Fireplace refractory brick cutting, masonry crown corbel chimney
24 – Fireplace refractory brick cutting, beehive floor
25 – Beehive oven pickup – prep exterior wall insulated Chamber Tech
26 – Beehive oven installation / stove delivery load up
27 – Insert deliveries – Fireplace (2) 10″ Pre-Insul liner installs
28 – Wood stove placement & liner installs / blue stone riser fab
29 – Wod insert connections and assembly / plumb guide install
30 – Beehive & fireplace liner assembly and install
31 – Defective fireplace liner extraction
32 – New liner assembly / rain prevented install
38 – Firebox construction / chimney crown support fabrication
39 – Firebox construction / chimney crown support fabrication